Crete United

CASE STUDY

Novant Health Forsyth Medical Center Chiller Generator Plant

12/03/24

When Novant Health made the decision to build a new 38,000 square foot chiller generator plant for the Forsyth Medical Center, FSS was excited join the team and offer their controls expertise.

As the design developed, a collaborative approach and selection of advanced controllers with advanced communication capabilities established a failsafe solution and provided seamless integration of the existing plant to enhance redundancy. The new plant consists of three 2500-ton Chillers, three Cooling Towers, 15 Electromagnetic Inline Flowmeters, Waterside Economizer, 6 Pumps, and filtration system in a variable primary flow configuration.

Interested in working with or joining Crete United?